Due to a complete total building loss, the site footprint was verified and a CAD sketch provided by our team was required for a proper valuation.
Based on site information, a preliminary repair budget was calculated that demonstrated that the policy limits would be exhausted.
Years of collaboration bring J.S. Held and Bracken Engineering together in their commitment to service and excellence.