J.S. Held expands EH&S and forensic engineering practices with the acquisition of Veritox, Inc. & GT Engineering. View press release.

close
Joplin, Missouri

Medical Office Building

Due to a complete total building loss, the site footprint was verified and a CAD sketch provided by our team was required for a proper valuation.

Based on site information, a preliminary repair budget was calculated that demonstrated that the policy limits would be exhausted.

Loading map...